TITLE 29--LABOR CHAPTER XVII--OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR PART 1926--SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION--Table of Contents Subpart S--Underground Construction, Caissons, Cofferdams and Compressed Air Sec. 1926.801 Caissons. (a) Wherever, in caisson work in which compressed air is used, and the working chamber is less than 11 feet in length, and when such caissons are at any time suspended or hung while work is in progress so that the bottom of the excavation is more than 9 feet below the deck of the working chamber, a shield shall be erected therein for the protection of the employees. (b) Shafts shall be subjected to a hydrostatic or air-pressure test, at which pressure they shall be tight. The shaft shall be stamped on the outside shell about 12 inches from each flange to show the pressure to which they have been subjected. (c) Whenever a shaft is used, it shall be provided, where space permits, with a safe, proper, and suitable staircase for its entire length, including landing platforms, not more than 20 feet apart. Where this is impracticable, suitable ladders shall be installed with landing platforms located about 20 feet apart to break the climb. (d) All caissons having a diameter or side greater than 10 feet shall be provided with a man lock and shaft for the exclusive use of employees. (e) In addition to the gauge in the locks, an accurate gauge shall be maintained on the outer and inner side of each bulkhead. These gauges shall be accessible at all times and kept in accurate working order. (f) In caisson operations where employees are exposed to compressed air working environments, the requirements contained in Sec. 1926.803 shall be complied with.





PEO7.com 23945 Calabasas Rd. Suite 106, Calabasas, CA 91302 818-222-4572 cs@peo7.com
SiteMap | PEO | Exploring the Possibilities | What is Employee Leasing | Why use a Peo | Free Advice | Benefits to Employees
Responsibilities of PEO | Benefit Package | HR Management | Pre-Employment Screening | The Issue of Control
Future of PEO | Request For Proposal (RFP) Contact Us | Peo Resources | Terms of Service | FAQ